Rear passageway improvements, St Helens

Minor Term Maintenance

Brief description:

This contract involves various environmental improvement schemes at the rear of various properties throughout St Helens. The existing areas are all overgrown vegetation which have had no previous maintenance.

Initially our work teams have to clear out the existing area and remove all of the shrubbery. The area is then graded off so that levels can be set out by one of our engineers so that a footways and carriageway construction can begin.

Drainage will also be installed by our work teams including road and footpath gullies and associated drainage as required to prevent surface water from ponding.
All works are carried out by multi skilled work teams who employ various plant and equipment to assist them in achieving a high quality finish to the project.

Achievements against targets:

All schemes have been completed within the target date and on budget.

Downloads: case studies

Click on the titles below to download a minor term maintenance case study.

» Midland Way, Warrington
» Passageway improvments, St Helens
» Green Lane, Maghull
» Lot 1 Highway Maintenance