Brief description:

As part of the Lot 1 Framework Contract, King Construction is the principal contractor managing a large locally based workforce and sub contractors to deliver the requirements of the contract. Our Q,E,H&S Director has developed an integrated management system that is designed to manage all company operations including environmental and health and safety obligations. The system has achieved ISO9001:2008, ISO14001:2004, and OHSAS 18001:2007.

Our company directly employs a number of teams delivering high volume work orders ranging from small scale footway and highway repairs, the installation of nameplates, guardrails, and street furniture, and planned and reactive maintenance (inc. 24 hour emergency).

The work orders from KMBC are processed using the CONFIRM computer system that is linked directly between their depot and King Construction’s head depot. The work packages are compiled and processed by KMBC’s Action Officers who then notify our CONFIRM admin team that there are work orders available on the CONFIRM system.

Achievements against targets:

2009/2010 KPI’s.

Downloads: case studies